Season 1

Tommy Walsh's Eco HouseSeason 1

2007
10 Episodes

Can you build an eco-friendly home in 60 days for £60k? Builder Tommy Walsh decided to find out. Together with his building team, Walsh undertook the project in what he calls the worst summer in the past 50 years, although that might have been a good thing for what he calls the central feature of the house's eco-friendly aspect - a water harvesting tank, intended to supply water to the toilets, dishwasher and washing machine in the two-bedroom, two-storey house. Despite the deluge of rain, the team slogs on, aiming for the 60-day timeframe.

Episodes

No Image
S01E01

Introduction

The DIY guru attempts to build an affordable eco-friendly home in 60 days with a limited budget.

03 Oct 200725m
No Image
S01E02

Installing Rainwater-Harvesting Drainage System

The team installs the rainwater-harvesting drainage system, which supplies the toilets, washing machine and dishwasher.

10 Oct 200725m
No Image
S01E03

Block-And-Beam Floor Delay

With the block-and-beam floor nowhere to be seen, the team tries to come up with a solution to allow the bricklayers to begin their work.

17 Oct 200725m
No Image
S01E04

Damp-Proof Membrane & Thermal Blocks

To improve the house's energy efficiency, a damp-proof membrane is laid to prevent heat loss and thermal blocks are used instead of concrete increasing, the house's thermal efficiency.

24 Oct 200725m
No Image
S01E05

First-Floor Joists & Timber Frame Roof

The joists for the first floor are installed along with the timber frame that forms the basis of the roof. And the team try to eat doughnuts without licking their lips.

31 Oct 200725m
No Image
S01E06

Polyurethane Wall Insulation

Polyurethane wall insulation is added, and the team considers installing supportive wooden pegs called 'nogs'.

07 Nov 200725m
No Image
S01E07

Roof Slates & Solar Panels

The roof slates and solar panels are fitted to the house, and the team learns the property will be the most energy-efficient in the Fens.

14 Nov 200725m
No Image
S01E08

Exterior Cladding & Under-Floor Heating

The house starts to take shape as the exterior cladding is fitted and the under-floor heating is installed.

21 Nov 200725m
No Image
S01E09

Rooms Boarded & Special Water Tank

The rooms are boarded in preparation for plastering, and a special water tank becomes the latest environmentally friendly addition to the project.

28 Nov 200725m
No Image
S01E10

Completing The Project

With the deadline looming, there's still a lot to do. Tommy and the team work on the fitting the staircase, tiling, electrics and plumbing in a bid to complete the project.

05 Dec 200725m