S36E15 – Lexington Project 2015: Part 7: Inspections
S36E15
14 Feb 2015

Lexington Project 2015: Part 7: Inspections

This Old House – Season 36

Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.

Cast

Download Subtitles