S13E08
24 Oct 1991

The Wayland House - 8

This Old House – Season 13

Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.

Cast

Download Subtitles

    This Old House S13E08 – The Wayland House - 8 | CinemaHub | CinemaHub